EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Voltar-S21
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (835)
Research
- (9)
Workshop
- (16)
Empennage
- (6)
Fuselage
- (182)
Firewall
- (19)
Tail Feathers
- (70)
Wings
- (191)
Controls
- (9)
Avionics
- (105)
Lighting
- (3)
Instrument Panel
- (72)
Landing Gear
- (11)
-
Jackpoints
-
Bolt up
-
Priming Gear
-
Primer Prep
-
Installing dual brakes
-
Installing dual brakes
-
Torqued landing gear...
-
On the Gear
-
Tail Gear install
-
Mounting landing gear
-
Assembling main gear
Engine
- (93)
Propeller
- (5)
Fuel System
- (6)
Interior Finish
- (35)
Paint / Decals
Inspection
- (2)
Tools
Suggestions
- (1)
Builder Name:
Vern Little
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
2341.9
Start/Last Date:
Mar 06, 2018 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=Voltar-S21
Home or Last Project Picture
Dec 28, 2020
Assembling main gear
- (2.0 hours)
Category: Landing Gear
Dave W 1.5 hrs. Installing tubs and bolting wheel halfs together.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.